Reader JIM in HOODSPORT writes about condensation issues:
“New Completed 40’ x 60’ pole barn with 16’ side walls and 24’ peak. Walls and ceiling insulated, 60’ long ridge roof vent. Full cement Pad with plastic vapor barrier under it. Cement was 60 days old when barn was completed.. rained just about every day. No windows or vents, using for RV storage and Shop. 2 – 12’x14’ roll up doors. 1 entry door. Will eventually have some sort of heat and ceiling fans installed.

Live in Hoodsport, Wa. Very near Olympic Mtns.
Issue is that the barn does not want to dry out … getting condensation on ceiling insulation…had contractor come out and clear out excess insulation that may have been blocking vent and make sure ridge is secure and no blowing rain can get in….had entire roof check for holes…
Still dripping..thought the vent and insulation would take care of the issue?
Afraid if I start putting vents all over the place I would be wasting the heat while I work in shop.
On a warm day should I open doors and get large fans and vent area of excess moisture? Get heaters in to dry out? Don’t propane heaters put moisture in the air?
Please Help…”
The short term solution is to open up the overhead doors and leave them open until it dries out.

Why you have the problem – your concrete floor is poured over a vapor barrier (excellent choice), however it does not allow any moisture to escape into the ground. You have a vented ridge, which will not work as it needs an air intake in order for air to escape from it. Your building should have had enclosed vented soffits – which would have allowed for airflow in at the eaves and out at the ridge.

Now – let us address the bigger and long term problem – you want to heat this building. As it stands currently, you might as well just put a heater out in the yard and expect it to warm your building. The “insulation” you have is nothing more than a condensation control blanket – it has an R value right close to absolute zero every time it crosses a wall girt or roof purlin. If your plan is to try to take the chill off a bit for an hour or two using a space heater, then you might as well plug up the ridge vent, which isn’t working anyhow.
If you want to be able to do a decent job of heating, you have some work to do.
First, get an engineered repair to upgrade your roof trusses to support at least a five psf (pounds per square foot) ceiling load. This can be obtained at a nominal charge from the company which manufactured your trusses.
Second, remove all of the wall steel. Take off the condensation control blanket in the walls and throw it away.
Third, install enclosed soffits with level returns on the eave sides. This will entail having to shorten the wall steel and adding some framing. Now the ridge vent will actually work. Put housewrap (think Tyvek) on all of the walls and reinstall the wall steel.
Fourth, after repairing the trusses, install ceiling joists between the trusses (2×6 #2 every 24 inches with joist hangers), install 5/8″ drywall on the underside and then blow in 15-20 inches of fiberglass insulation, making sure to allow at least an inch, if not two, of clear air flow at the eaves so you do not block the vents. This will mean a lesser R value at the sidewalls. You could have four inches of spray foam insulation placed on top of the drywall in the two feet closest to each sidewall, which would help.
Lastly the walls – fill the insulation cavity completely with unfaced insulation, cover with 6 mil clear visqueen, then gypsum wallboard.
Oh, another sidebar, please check the engineered truss drawings for your building – there may be some truss web bracing which is missing, most likely on the diagonal webs going up from the bottom chord at the center of the trusses.
The necessary R-value for the attic will depend upon the manufacturer and style of insulation chosen. Check with the manufacturer’s instructions on the packaging to determine how much insulation thickness is needed to achieve the desired R-value.
Take off the steel siding, remove the reflective radiant barrier from the walls and install a quality building wrap (like Tyvek), then put the siding back on. The barrier is keeping moisture in your building, whereas a building wrap allows moisture to exit. Completely fill the wall cavities with insulation. Place a well sealed vapor barrier between framing and gypsum wallboard to be installed on the walls. Do not place a vapor barrier between the ceiling drywall and the roof framing above.
DEAR POLE BARN GURU: Pole Barn Guru, do you have to have girt under end trusses. End trusses setting on 2×12 from header and nailed to 6×6 pole with 2×6 blocking below trusses 24″o.c. sheated header 3 2×12 notch blocked and clipped. STEVE in CHEYENNE







Faced insulation is the absolute wrong product to use for insulating your ceiling. Any insulation placed at the truss bottom chord level should be unfaced. The best bet would be to blow insulation in above the finished ceiling.






Freshly poured concrete contains a tremendous amount of moisture. In a typical two car garage (24 feet square) with a nominal four inch thick slab – the concrete contains approximately 138 gallons of water! As the concrete cures, much of this water is liberated into the air, increasing the relative humidity and vapor pressure within the building.


If the builder would have properly installed the insulation between the purlins, with the Kraft facing towards the climate controlled area, making sure all seams were sealed, it would have been both effective as insulation and the vapor barrier would have kept the warm moist air inside the building, from condensing on the underside of the roof steel.