Splitting More Than Hairs

Splitting More Than Hairs

Reader MATT in AUMSVILLE writes:

“Hello I have a pole barn that is 1.5 years old. Lately I noticed a crack in one of the 6×8 posts. It spans the entire side and the widest spot is 5/16 inch and 2 inches deep. The truss is attached to the post and so is the lean to. The eve height is 14 feet. Is this normal checking or should I be concerned?”

Now you are witnessing just one of a myriad of reasons Hansen Pole Buildings provides true glulaminated columns for all roof supports. Stronger, straighter, lighter weight and nearly impervious to checks and splits. Structural standards for timber typically address load-carrying capacity, deflection limits, and modification factors for strength-reducing characteristics, rather than establishing a specific “allowable” measurement for checking itself. Checking—separation of wood fibers along grain—is a natural characteristic of seasoning monitored for its impact on a member’s structural integrity, particularly regarding bending and shear stress. Building codes and National Design Specification (NDS) evaluate members based on their adjusted allowable stress rather than prescribing specific dimensions for natural features like checks. Because checks can affect a timber’s ability to resist shear, structural design focuses on ensuring actual demand on member does not exceed its capacity after accounting for material conditions.

Checks and splits are strength-reducing characteristics and can be assessed by qualified professionals to determine if they significantly impair a member’s ability to carry shear loads.

When evaluating existing timbers exhibiting checking, focus is on whether size or depth of checks threatens member’s performance under design loads. While prescriptive codes provide a framework for checking beam capacity, assessing specific site-grown checks often requires an inspection to determine if integrity of cross-section remains sufficient for intended use. A qualified Registered Professional Engineer can determine if a specific check is a standard seasoning characteristic or a structural defect warranting remedial action.

Distinguishing between structural checking and dangerous wood splitting requires evaluating depth, orientation, and severity of separation relative to grain of timber. Checks are natural, shallow surface fissures often under 1/16th inch deep caused by wood’s seasoning process, whereas splits represent a more significant failure of wood fibers and can compromise load-carrying capacity.

Tension Cable Location, Double Columns, and Girt Dimensions

This Wednesday the Pole Barn Guru answers reader questions about the location of ceiling ties for roof tension, if a person needs to double columns when switching building heights, and a clarification about the dimensions of commercial girts to building columns when used for finishing the interior walls.

DEAR POLE BARN GURU: Hi. I just left you a voicemail; I’m sending pics to illustrate my problem. The tension cables that hold my barn together are 6 feet high (on the 2nd floor). It limits the utility of my barn. I am under the impression there is a way to engineer this to raise them to a more reasonable height without compromising the structural integrity of the building. Thanks, DAVE

DEAR DAVE: Thank you for your photo. Chapter 8 of the International Residential Code has extensive provisions on stick framing roofs. https://codes.iccsafe.org/content/IRC2018P7/chapter-8-roof-ceiling-construction.

Using Code provisions, you could have a ceiling tie positioned as great as 1/3rd of rise of roof above top plate of your wall – and do away with your cables entirely.

 

DEAR POLE BARN GURU: When switching building heights, 12′ garage to 10′ living space, should I double the posts and trusses at that point? SCOTT in BROOKVILLE

DEAR SCOTT: Perfect timing as our Design Studio Manager and I just had this discussion! You do not need to double columns. Columns on taller eave portion will carry loads going each direction. Place “end” truss of tall section notched into columns 1-1/2″, then use a truss mounted to face of columns to support lower roof (it will overlap upper roof end truss. Assuming you are using 6×6 (or better yet glulaminated columns https://www.hansenpolebuildings.com/2024/04/new-hansen-pole-building-roof-supporting-columns/), you can frame this joint wall using 2×6 bookshelf girts 24 inches on center.

 

DEAR POLE BARN GURU: I ran across your blog about commercial (bookshelf) girts (https://www.hansenpolebuildings.com/2011/09/commercial-girts-what-are-they/), and I was a little confused. You mentioned allowing the girt to overrun the exterior face of the column by 1 1/2″ and you gave the example of using a 6×6 post and a 2×8 girt. This confused me because 6×6 is actually 5 1/2 x 5 1/2, and a 2×8 is 1 1/2 x 7 1/4. This would have the girt extending 1 3/4″ beyond the exterior edge of the column, no? Are the posts in your example a unique size to Hansen Pole Buildings, such that the 6×6 is actually 5 3/4 x 5 3/4? If I built this using standard dimensional lumber, I’d have to allow the girt to run past the interior edge of my post by 1/4″ to make this work on the outside. What am I missing? Forgot to add my email in the box! MIKE in OCEAN SPRINGS

DEAR MIKE: Your critical dimension is 1-1/2″ running outside of your columns. In our instance, we actually are now furnishing America’s strongest glulaminated columns in all of our buildings (Read more here: https://www.hansenpolebuildings.com/2024/04/new-hansen-pole-building-roof-supporting-columns/) and they measure 4-1/8″ x 5-1/8″. It does not negatively impact your interior finishes to have girts projecting inside of wall columns by even this 5/8″, whether steel liner panels or gypsum wallboard, any interior finish will easily bridge this space.

Glulams Receiving a Precision Finish, video #7

Today’s blog is the 7th is a series of videos from Mike the Pole Barn Guru’s tour of our glulam provider, Richland Laminated Columns. Glulams receiving a precision finish.

Tune in Tuesday the 20th for the 8th in a series of Mike’s tour of Richland Laminated Columns.

Glulam Finishing Touches, video #5

Today’s blog is video #5 in a series from glulam provider Richland Laminated Columns, covering the finishing touches of the process.

Tune in Tuesday August 13th for the 6th video in the series.