Tag Archives: fire retardant

Insulation/Envelope, Egress Window in Gable, and Ribbed Steel Testing

Today’s Ask the Guru tackles reader questions about how to best insulate/envelope a pole barn shop in AZ, if the Guru has “an engineered work around for gable ends so I could replace the vent with an egress window,” and trying to find out if pole barn ribbed siding is tested under NFPA275 to be used to finish the inside when the walls are spray foamed.

DEAR POLE BARN GURU: Hello, I am currently being approved from my lender to build a 30’x40’x10′ pole barn shop. I will have 12″ eaves with soffit vents. The shop will be climate controlled 365 days a year. I am getting lots of different advice on insulation/building envelope. I wanted to get your opinion. I do not think spray foam will be in my budget. Could I use Tyvek wrap with fiberglass batts in walls and blow in fiberglass in ceiling? Or should I use something like Solarguard under the roof, and Tyvek on the walls. I would appreciate any suggestions you may have. I want to get this build right. If you could send me your reply to my email that would be great! Thanks so much. SHAWN in NOBLE

DEAR SHAWN: Noble is in Climate Zone 3A, where I would not typically have recommended spray foam insulation anyhow. Roof – Solarguard is not insulation. Order roof steel with an Integral Condensation Control factory applied (Condenstop or Dripstop are a couple of brand names of I.C.C.). Blow in R-49 fiberglass or granulated mineral wool (best), above ceiling, using raised heel trusses to get full depth of insulation from wall-to-wall. Ventilate eaves and ridge. Walls – Housewrap between steel siding and bookshelf wall girts. Unfaced R-20 (or greater) batts either fiberglass, or better yet mineral wool, with a well-sealed interior vapor barrier. Slab – if not doing radiant in floor heat, use R-10 rigid insulation on inside of pressure treated splash plank, from top of slab down two feet. If using radiant floor heat, then R-10 at slab edge and a minimum of R-5 continuous under slab.

 

DEAR POLE BARN GURU: Do you have an engineered work around for gable ends so I could replace the vent with an egress window? BRUCE in GOLDENDALE

DEAR BRUCE: It is likely it can be done however it may require other structural modifications in order to not compromise shear integrity of your endwall. You should reach out to a competent local Registered Professional Engineer who can do a physical site evaluation and then design a proper structural fix.

 

DEAR POLE BARN GURU: I’m a bldg. inspector and we’re trying to find out if pole barn ribbed siding is tested under NFPA275 to be used to finish the inside when the walls are spray foamed and if so is there a certain gauge that is only approved? Thanks ROBERT in ALBERT LEA

DEAR ROBERT: Ribbed steel siding does meets UL 790 Fire Resistance Class A requirements, however I am not finding any evidence of testing to prove it meets NFPA 275. I did find evidence of IMP (Insulated Metal Panels) with 26 gauge interior facings probably meeting requirements, however it would be up to the individual Code Official to make a judgment as to whether, in their opinion, 26 gauge panels would be adequate. https://www.metalconstruction.org/view/download.php/online-education/education-materials/imp-educational-materials/fire-safety  In my humble opinion, best practice would be to use an intumescent fire proof paint on interior surface of spray foam, prior to installation of interior steel liner panels.

 

 

 

 

Cellulose for a Pole Barn Attic

Multiple options are available for insulating attics of post frame (pole barn) attics. Reader NATE in BURNHAM writes:

“Hello! I have been doing some research all evening and I can’t seem to find an answer. I did take the time to read some various forums and blogs regarding this subject to no avail…having said that, here is my question; According to the attached spec sheet for my roof trusses (4ft O.C) spanning my 52Lx28Wx10H pole building, would blown in cellulose insulation at an R38 value combined with 6ml plastic sheeting (vapor barrier) and thin gauge metal ceiling be supported? I do know from the specs that my BCDL is 5psf. Any help on this would be wonderful as I am at a stopping point in finishing my garage. Thank you!”

Mike the Pole Barn Guru advises:

I am going to hopefully change some of your plans here….

Unless your building is where there are 8000 heating degree days or more, you should not have a ceiling vapor barrier (no 6ml plastic sheeting). In Pennsylvania you are well under this requirement (Northern Minnesota would qualify). You do need to have sufficient eave intake and ridge exhaust ventilation to allow warm moist air from inside of your building to be vented out above your insulation. Your total NFVA (Net Free Ventilation Area) must be no less than 699 square inches, with at least 50% and no more than 60% located at the sidewall eaves.

Blown in cellulose weighs roughly 2.5 to 3 pcf (pounds per cubic foot). Blown in cellulose will settle as much as 20% and can take up to two years to do so. Cellulose gives R-3.5 per inch, so your R-38 would be 10.86 inches thick (after settle), so I would plan on no less than 13.5 inches blown in to achieve your R-38. To be safe, I would assume 3.4 psf (pounds per square foot). Besides settling, blown cellulose does have another downside – in order to be fire retardant it is treated with borax or boric acid. Borates can be corrosive to steel in humid or moist environments, so you may want to consider a different insulation type, such as fiberglass. Fiberglass is also lighter weight, coming in at about a pound per cubic foot.

Steel liner panels are most typically 29 gauge steel weighing in around 0.6 psf.

Your five psf BCDL (bottom chord dead load) has to also account, in part, for weight of your trusses and bottom chord bracing, as well as any electrical and light fixtures. Most often this is considered to be a pound per square foot. This is going to put your proposed use of cellulose right at capacity, without any remaining margin for error.