Public Works Pole Barns, and Labor Costs

Public Works Pole Barns, and Labor Costs
Many town/city jurisdictions in the United States have a Department of Public Works, which depending upon the individual municipality it may be responsible for a wide variety of activities including maintenance of streets and roads, maintenance and operation of drainage facilities, sewer collection lines, maintenance and operation of sewer treatment facilities, coordination of environmental activities, building code enforcement, construction inspection and approval, maintenance of public buildings, operation of a central garage, engineering services for construction projects including design and supervision, traffic control device maintenance, traffic control engineering.

Busy people.
Looking over the list of activities to be handled, there are plenty of them which involve the need for buildings for a myriad of functions. Anything involving equipment needs a secure place for storage and maintenance.

Traditionally post frame (pole barn) buildings to be used for public works operations are subject to going through a bid process. One of the requirements of many of these projects is the need for labor to be paid under the Davis-Bacon Act.
Learn more about the Davis-Bacon Act here: https://www.hansenpolebuildings.com/2013/07/pole-building-labor-costs/.

There is an alternative, however.
Here is an example.
Back in the day, my father and uncles were framing contractors in the greater area surrounding Spokane, Washington. Among building projects they framed, were several post offices owned by developer Harlan Douglass (find out more about Harlan Douglas here: https://www.spokane-rentals.com). Harlan would secure long term leases from the postal service for the buildings, then have them constructed without the need to pay prevailing wages.

This was a win-win for all involved. The postal service got their new buildings, with the monthly lease payments being less than what would have been payments on loans to construct. Harlan could take the leases to the bank to secure funding, so he was building with other people’s money – making a profit on the spread between the lease income and the underlying mortgage payment. Plus, Harlan could take the depreciation on the buildings as a paper loss on his taxes to offset this and other income. This process also negated the need to go through the public bidding process.

If your municipality needs a new post frame building, following the lead of Harlan Douglass might be an alternative which gets the end resultant sooner rather than later or never – at a savings to the tax paying public!

Pre application Conference

construction planning meetingConsidering construction a post frame building for commercial use? If so, many jurisdictions offer a pre application conference which will greatly ease the overall permit process, as well as providing a total view as to all of the requirements necessary to be met.

Why should I go through a PAC?

In my humble opinion, if a pre application conference is an available option – take advantage of it, It can save boatloads of future grief, not to mention unexpected pitfalls and costs.

What does a PAC involve?

A Pre Application Conference (PAC ) is a preliminary evaluation of a project by staff from various the various departments and divisions, which will be involved with a potential project. Staff represented may be from several departments, which may include: Planning, Building, Fire, Public Works, Health, and Water and Power. In some instances a Case Manager is assigned who will facilitate the PAC and provide a single point of contact to help navigate through the entire review and approval process.

PAC Meeting Agenda

At the PAC meeting, the staff will meet to discuss project issues and requirements of the proposed project according to current regulations, guidelines and policies. It is an opportunity for the staff to identify any discretionary reviews and approvals necessary, inform of any possible conflicts with policies and regulations, and, if necessary, offer other options to pursue in lieu of those proposed. A flow chart outlining the course the proposed project will need to take through the review and approval process is also provided. All documentation, including applications, brochures, submittal requirements, fee estimates, a flow chart, and review comments related to the project are provided often in an organized packet called the Development Guide. The information derived from a PAC does not constitute any approval of a project. PAC meetings are not public hearings.

What sort of things might be brought out at a PAC?

Highway/roadway/public works people will advise if the street may need to be widened, turn lanes added, as well as requirements for curbs and sidewalks. Having had to pay for all of these items in projects I was personally involved in, it is best when they are known about upfront.  After the fact… they can be potential budget breakers.

Fire – how close can a proposed new pole building be from other structures or property lines before fire walls need to be considered? Does the property have adequate water flow available for fire prevention? In some cases, an alternative water reservoir may need to be added. A hydrant (or hydrants) may need to be included for the development. If fenced or gated, a Knox-Box® will probably be required.

What else do I need to do?

Planning will deal with percentage of the property which can be covered with structures, dimensions of the building(s) as well as heights, setbacks from property lines, roadways and easements. They may require an engineered site plan, as well as provisions for storm water runoff. Requirements for parking spaces can be determined.

While these are just a few of the involved parties, the areas which may be covered and potential costs can be extensive and expensive. Structural building plans are not required in a Pre application Conference.  This is the opportunity to find out what the real costs for the entire project will be.  Not just the building structural costs, which are usually just a fractional portion of the entire project.

Good luck, and let me know if this process helped to speed things along to get your permit!