Engineered Buildings Part I

Some or all of a building collapses in a wind or snow storm. Upon examination, it is determined the building had several major weaknesses due to lacking engineering. The building owner is frustrated and angry as he truly believed he had purchased a properly engineered building.

A properly engineered building, in the average client’s mind, is what I refer to as a fully engineered building. A fully engineered building is developed by following three structural design steps:

  1. Calculate all loads and load combinations to which the building will be subjected.
  2. Determine how loads are distributed to building elements (this step is known as structural analysis).
  3. Then select components and connections capable of handling forces to which they will be subjected. In practice, selected components and connections will directly influence structural analysis.

A fully engineered building is one in which all structural component interactions are properly accounted for during structural analyses, and forces resulting from these analyses are used to size all components. Non-engineered building design processes do not account for component loads or actual component strengths. In the middle lies a partially engineered building.

In snow country, many collapsed building failures are triggered by unbalanced snow loads (drift or sliding snow loads) which structures should easily withstand. Upon forensic failure review, it becomes obvious these buildings were not fully engineered.

This engineering lack can be attributed to many companies involved in low or moderate risk building construction does not employ engineers.  Nor do they hire an engineer to perform structural engineering calculations for buildings they construct. Each year this lack of responsible building designing results in numerous buildings constructed which contain multiple components and/or connections not sized to handle loads the building is expected to experience.

Companies which erect or provide non-engineered buildings generally try to copy designs they have seen elsewhere. This causes a myriad of problems.

Simply copying, altering and/or scaling up an existing design completely ignores the fact loads like wind and snow are highly dependent on size, shape, orientation and building location. Also local topography characteristics and size, shape and orientation of attached and surrounding structures influence design. Additionally, snow, wind and other structural loads act in a variety of combinations and a building must be designed to handle all load combinations to which it could be subjected. Total ignorance of applicable loads and load combinations is a non-engineered building design hallmark and explains why so many buildings are damaged by wind and unbalanced snow loads which would not damage a fully engineered building.

Extremely weak connections between components are prevalent in non-engineered structures. Stresses which surround bolts, screws and nails are complex and control fastener size, spacing and placement relative to component ends and edges they connect. These conditions are seldom realized by builders attempting to mimic other building designs. Improperly assembled connections trigger and/or contribute to many building failures.

Some building companies are established by individuals who begin erecting buildings for companies which employ engineers and sell fully engineered packages. While I applaud anyone’s entrepreneurialism in starting their own business, it is indeed scary when some of these individuals start erecting or providing non-engineered buildings. Participating in engineered building erection does not make one an expert in building design, no more than designing a building makes one an expert in safe and efficient building construction.

Very few builders, architects, code officials and non-structural engineers understand the true complexity of a fully engineered pole building system. Several building elements perform multiple functions not apparent or understood by those not actively engaged in post-frame building engineering. In addition to having no idea of  loads to which a component is subjected, builders are not familiar with all methods available to resist applied loads and do not have the expertise needed to determine proper size, support system and connection designs for a building component.

One of my pet peeves is builders who call me and argue with me over “how you should design your buildings” based on the 5 or 6 pole buildings they’ve put up over the past 10 years.  Just because they didn’t fall down (yet), is their claim to be the expert!  Sadly, clients too often are duped by these guys because: 1. “This is just the way we DO buildings here” and 2. “Joe has been building around here for 30 years so he must know”.  Again, just because “Joe’s” buildings haven’t yet fallen down (and maybe never will) does not guarantee longevity and more importantly not calculated safety factors.

When I owned Apex Roof Truss, we sold a set of 60′ trusses to a builder for a building up north. Only after the building collapsed due to a record snowfall, did we get to see photos of it prior to collapse. At the time, there were several feet of snow on the roof, and the purlins between the trusses were sagging a good three inches between the trusses. Now the builder (who had written us a bum check for the trusses and his contractor registration had expired) built the building “the way he always did”. Two problems.  One, he used 2×6 purlins on edge, where the truss spacing and snow load would have taken 2×8 to carry the load (hence the hug sag) and two, he left out most of the required truss bracing.

When the purlins started breaking, everything else started sucking in behind them.

Come back tomorrow for Part 2 of 3 in my rant on under designed buildings – meaning NON –engineered pole buildings.

2 thoughts on “Engineered Buildings Part I

  1. Exploring the possibility of a pole-built garage (as opposed to stick built). Lots of things to consider including the building materials. Going back to your post on 11/27/13, you discussed masonite and EWST (by the way, is that the same as your-also referenced LP SmartSide). And is either of those materials the same as Duratex? If so, which?

    Any input you can provide would be much appreciated.

    Reply
    1. Pole (post frame) is going to be the most economical design solution for virtually any low rise situation, including your new garage. Duratex is aluminum trim coil manufactured by Alsco. LP SmartSide and Masonite are both EWST products.

      Reply

Leave a Reply

Your email address will not be published. Required fields are marked *