When Columns Get Put in the Wrong Place

This is construction, things happen. The true mark of how any particular project goes is not everything going perfectly without a hitch, it is the ability to solve challenges when they arise.

The scenario below is one which I have never had a DIY person do (shout out to all of you who are putting up your own buildings), only “contractors” who somehow neglected to read this particular portion of the building plans (portion being used liberally as the column sizes are only called out on five different pages of the engineer sealed plans).

treated postFrom the client:
“I realized last night that the crew who installed my posts placed the posts in the wrong locations and they are now cemented in. Instead of using the laminated posts in the center section they put them on the ends of the building. That means the solid posts are in the center section. I need to know if/how this will affect my building? Thanks.”

And my response:
Thank you for utilizing the Hansen Pole Buildings’ Technical Support system. It appears you have some challenges to resolve. As the columns are now installed, the ones on the sidewalls, where the glu-laminated columns were supposed to be, will be over-stressed and will not support the wind loads adequately. There are some options:

(a) Dig the columns out, chip the concrete off of them and replace them where they belong. This involves more work than the later options, but will not require an investment into more columns.

(b) Dig out only the six errantly placed 6×6 columns, order six new glu-laminated columns to replace them. Less work, however there will be the cost of the six columns.

Either of the above choices (a) or (b) will involve properly compacting the soil into which the corrected columns will be replaced.

(c) This fix is subject to approval from the engineer of record and would have a nominal fee for him to author and seal a letter to confirm the adequacy. Place a 2x10x14′ #2 Pressure Preservative treated to UC-4B on each of the sides towards the endwalls of the six offending 6×6 columns – starting at the top of the concrete bottom collar. 2x10s to be attached with 2-10d common hot dipped galvanized nails, spaced every six inches and staggered to avoid splitting. There is approximately a five week lead time to get the 2×10 treated, as it would be by special order – there are not lumberyards (or big box stores) which have this material in inventory.

Constructing a new post frame building? Whether a DIYer or a veteran contractor, please follow the adage of: “Look at the plans twice, so materials only have to be installed once!”

Making Your Own Glulam Columns

Should I Make my Own Glulam Columns?

I’ve been internet chattering back and forth with a gentleman named Chris, who is probably never going to order a Hansen Pole Building, but it is okay – we have thousands of clients a year who are knocking at our doors (figuratively) ready to place their orders.

Total Disclosure – I do not get paid, nor does Hansen Pole Buildings, LLC get any sort of financial compensation in return for my endorsement of a particular product or vendor.  If I like a product, I will tell my readers straight up about it. Same goes the other direction.

Here is an excerpt from our most recent discussion:

Chris: “And I was going to make the laminated posts gluing and baking them, I have a local lumber company (not Lowe’s or HD ) they have good treated lumber that can be placed in ground.”

Me:  “The most important things to me are people getting great buildings and good value for their investment.

I believe you trust in my judgment. Please do you and me both a favor and buy true glulaminated columns.

Here are just a few reasons….

The 2×6 they use to make them is nearly half again stronger than anything you can buy at the lumber yard;
They use glue which is designed to hold up – even under ground and in wet conditions;
In order to get a true glue bond, the wood must be planed, then glued within 24 hours;
They have the equipment to press them during curing – which keeps them nice and straight;
The time alone you save will more than pay for them.

There are plenty of ways to save money on your new post frame (pole) building kit – building your own glulaminated columns is not one of them.  If you want to save both time and money (and end up with a better building), spend a few hours browsing about the nearly 1200 articles I have written and/or the over 600 questions I have answered from my loyal readers.

Have an idea and want to know if it is practical or not? Run it past me…. I’ll give you the straight story, every time.