Plan to Avoid Failure, Closed Cell Foam, and Addition to Building?

DEAR POLE BARN GURU: We are planning to build a pole barn in the near future and, I need some advice on the footings. depth width etc. We are planning to use rough cut 6×6 pine for the posts and plan to use anchors. The soil here on the property is very sandy. I’ve set some treated corner post for our fence 4 ft down, easiest digging I’ve ever done with post hole diggers. It’s pretty sandy here.
Here’s the link to the barn we will be building.

https://bioengr.ag.utk.edu/Extension/ExtPubs/Plans/T4161.pdf

Thanks DAVID in CASSATT

DEAR DAVID: My advice is to invest in a complete ENGINEERED post frame building kit package from a reputable supplier. You will get all of the correct answers on not just the holes, but every component of the building – it takes away the guesswork and minimizes the probability of a failure.

 

Engineered means the building plans are sealed by a RDP (Registered Design Professional – architect or engineer) specifically for your building at your site.

 

DEAR POLE BARN GURU: We are building an air conditioned metal building using 2×6 studs 16″ OC with 1″ deep hat channel running horizontal instead of C-purlin. The metal panels will attach directly to the hat channel. Drywall will be attached on interior of 2×6 studs. Open cell spray foam will be applied. My question is should we apply spray foam directly to metal panels or should we use a house wrap in between the hat channel and the metal panels and apply spray foam to house wrap? We live in a hot humid climate, so moisture in the wall system is a concern. AMBER in BULVERDE

DEAR AMBER: My problem is with the open cell spray foam, in my humble opinion – use closed cell foam as it has a higher R-value per inch, it seals to reduce air infiltration, it is highly water-resistant and it does not store water. Yes closed cell is more expensive, however you can eliminate the need for building wrap to help offset some of the added investment. Some studies have shown closed cell spray foam to increase the racking strength of walls as much as 300%.

I recently added an elevator shaft to the side of my post frame building, which has steel roofing and siding. My choice of insulation was closed cell spray foam.

DEAR POLE BARN GURU: Can you add onto an existing pole barn? RHONDA in SALEM

DEAR RHONDA: In most cases, yes. There are some things you can do which will help your Building Designer. The best thing is for you to provide them with the original engineered plans and sealed prefabricated roof truss drawings. It would behoove you to confirm the eave height on the building, matches what is on the plans, as this is an area of frequent variation.

Engineer sealed pole barnAt the very least, confirm all dimensions and the roof slope, as well as provide digital photos showing all fur walls, both inside and out, as well as up at the roof system from the inside both at the end bays and in the middle of the building.

 

 

Know how far away your addition must be from other buildings, property lines, etc., as well as the total area which is allowable for the existing building and the addition.

 

2 thoughts on “Plan to Avoid Failure, Closed Cell Foam, and Addition to Building?

  1. Do you think closed cell under metal roof with open cell in wall cavity is a good combination of cost and benefits? Really want the extra strength of closed cell – plus if leave exposed on cathedral ceiling it looks better.

    Barndo is 48×56, 16 ft walls and 7/12 pitch – so lots of space to spray.

    Thanks

    Reply
    1. admin Post author

      You will want to check with trus fabricators – most of them cannot build and ship a 48′ span truss with a 7/12 roof slope. On to your question – in order to effectively insulate your roof, with exposed trusses, you are pretty much obligated to go with closed cell spray foam, or have to devise an intricate ventilation system above some other alternative. For walls, I am not too excited about just open cell – as it allows moisture to pass through and you could end up with it getting trapped on the inside of your wall steel. A better option might be two inches of closed cell to the inside of your wall steel, then fill balance of cavity with open cell. You’ll need to make sure your HVAC provider is designing a system to prevent excess interior humidity as you will be drying to the inside.

      Reply

Leave a Reply