Building Permits, Building Changes, and Frost Protection

This week the Pole Barn Guru answers questions about ability to “build … without any problems…” permitting, adding wall skirting to an open building, and appropriate frost protection.

DEAR POLE BARN GURU: Can I build my pole barn in Hernando County without any problems from the county for permitting which is located in Brooksville, Florida? CHARLES in BROOKSVILLE

DEAR CHARLES: Maybe – you need to be discussing with your county’s Planning Department at (352)754-4057. It will depend upon zoning of your property, restrictions and lot size.

This will help you along: https://www.hansenpolebuildings.com/2013/01/planning-department-3/

 

DEAR POLE BARN GURU: Bought a home with existing pole barn and need to find a local contractor to skirt it. How do I find someone to do underpinning? JANE in HIXSON

Roof Only Riding ArenaDEAR JANE: Before making changes to your building, such as this, it would behoove you to consult with engineer who originally designed. If they are unknown or unavailable, you should consult with an engineer who can evaluate what you have and what you want done, in order to determine if structural upgrades will be necessary. Many pole barns with little or no sides were not originally designed to support this added wind load, and it is best to be safe, rather than sorry.

Once you have engineer approval, check to see if a Building Permit is required.

Only then could you go to your local Craigslist and post what you want done under “Gigs”. Be fairly specific and you should receive several qualified responses.

 

slab edge insulationDEAR POLE BARN GURU: We plan on installing a cement slab floor inside our pole building for our farm shop. We were planning to install hard board insulation 2 ft deep 2 inches thick around the perimeter of the building. But we have a footing and wall of 42 inches underneath insulated garage doors. Do we need to have insulation on the outside of the walls below grade to keep frost from migrating inside under the floor? We have a 48 ft door, plus a 24 and a 16 ft door on this building. We will drive trucks or combines inside this building. We are doing this project right now…we have finished first wall. Thank you for your help. ED in FREELAND

DEAR ED: Yes, you should be placing insulation outside of your building walls, below grade, to prevent frost from migrating under your concrete floor. Please read this article for more information: https://www.hansenpolebuildings.com/2016/11/frost-protected-shallow-foundations/

 

 

3 thoughts on “Building Permits, Building Changes, and Frost Protection

    1. admin Post author

      Structurally there should be no reason you cannot, however you should check in with your permit issuing authorities beforehand.

      Reply

Leave a Reply

Your email address will not be published. Required fields are marked *