One of the main objectives of Hansen Pole Buildings is to educate our customers on pole building construction. Over the past couple of years we've kept track of the "most asked" questions and grouped them together under general categories. If you have a question you can't find the answer for here, please call us: 1-866-200-9657

Or go to the Contact Us page for quickest response to your questions.

Click on a general category below to "open" that section.



About Us Our Pole-buildings Your Building Site
The Pieces Roofs Walls
Doors & Windows Insulation Overhead Doors
The Website Privacy Information Building Codes
Drawings Design & Pricing Ordering & Payment
Scheduling & Shipment Foundations Delivery Time
Getting It Built International Warranty  




FOUNDATIONS

Does my building need a foundation?

The pressure-treated columns of your pole building embedded into concrete backfilled holes in the ground become the foundation for your building.

BACK TO TOP

Should I have my concrete slab poured first?

No.

BACK TO TOP

Can I pour a concrete slab in the building after the construction is completed?

Yes! This is the best time to pour it. Hansen Pole Buildings uses a 2 x 8 pressure-treated skirt board around the base of the building. This will become the form for pouring a concrete slab. The bottom of the skirt board will be even with the bottom of your concrete floor. Concrete can normally be poured through the large door opening. If the concrete contractor requires additional access to pour the concrete, some wall metal can be left off until after the concrete is poured.

BACK TO TOP

What if I have an existing foundation or slab and want to use it for the building?

In most cases it is easiest and cheapest to cut holes in or through your existing concrete so the posts can be embedded in the soil. Should you not want to do this, your pole building can be mounted to the existing concrete, providing your building inspector determines your concrete is adequate to support the loads. This will require an inspection by the building inspector and may also require hiring an engineer to make an adequate determination. All of these steps take money.

BACK TO TOP

What slab thickness do you recommend?

The quality and strength of a concrete floor is more a function of the fill placed beneath it. For most uses if a site is well drained and has good compacted fill, a nominal four-inch thick slab will be more than sufficient.

BACK TO TOP

What about concrete “cookies”?

Not only do they not taste nearly as good as the ones Grandma used to make, but they are also not required in our building design. A concrete “cookie” is a pre-cast chunk of concrete 4 to 6 inches thick and 12 to 16 inches in diameter. They are thrown into the bottom of holes and the building columns are placed atop them. These are primarily used in design with total gravel, sand or soil backfill around the columns and in all but the smallest spans and lowest loading conditions, are of inadequate size to distribute the weight of the building, when loaded, to the soil, without settlement.

BACK TO TOP

Do you furnish concrete and rebar?

Due to the logistics (and weight) of shipping, we do not furnish any cement, concrete, rebar, wire mesh or any other materials which would be used to backfill your building columns or to construct a concrete floor, foundation or curb.