One of the main objectives of Hansen Pole Buildings is to educate our customers on pole building construction. Over the past couple of years we've kept track of the "most asked" questions and grouped them together under general categories. If you have a question you can't find the answer for here, please call us: 1-866-200-9657 Or go to the Contact Us page for quickest response to your questions. Click on a general category below to "open" that section. DELIVERY TIME After I order my building when will it arrive? While seasonal variations occur, most buildings can be delivered within three to four weeks after order. If you do NOT require a delivery within this time frame, please advise us at time of order and we will do our best to schedule delivery to best meet your needs. Can I request special delivery times? If you want special delivery arrangements, please contact Hansen Pole Buildings-Productions Department at 866-695-2131 immediately, otherwise your materials will be shipped per your original delivery date at the vendor’s convenience. We request all vendors contact you 24 hours prior to deliveries, but we have no control over our request. How much room will be needed for adequate access? At least 10 feet in width and up to 14 feet of height are required to deliver standard buildings. Large roof trusses can require widths of 14 feet or more and the ability to get truck and trailer combinations of up to 100 feet in length near the building.
Does everything arrive at one time? Not usually. Most of our vendors ship directly to your site. Deliveries can happen over a span of a week or more and we have little or no control over the exact date of arrival. All vendors are encouraged to call you 24 hours before they deliver. Some vendors will require you to be present, on site, at time of delivery. They will advise you of this, when they call prior to delivery. We suggest you mark the location you would like materials to be placed. A red spray painted message “DROP HERE” on the ground or a white paper plate on a stake with the same words, usually is a big help. Our goal is to deliver your lumber and truss package the week prior to construction start, the roofing, siding and doors the week of construction. Do I need to send a map? The steel roofing and siding supplier both require a map. We will provide a toll free FAX number and email address for you to send this directly to us. Do you unload the materials for me? In most cases, yes. With larger truss spans (usually over 40’ in width), you may be required to provide lifting equipment to help off load the trusses. In no case does unloading include setting of trusses onto your building columns by crane or any other equipment. Due to geographic locations (primarily AZ, CA, NV and UT), you may have to unload some or all of your materials. Not all steel trucks are equipped with offloading equipment. If this happens to be the case, you will need to provide appropriate equipment to offload the steel roofing and siding. The specifics of how to offload materials are covered extensively in our Construction Manual. Whether the truck has the ability to self offload or you are offloading, you have a maximum of one hour for the truck to remain at your jobsite. After an hour you will be billed at a rate of no less than $120 per hour for standby time. Does the price of your kit include setting the trusses to the columns when they are delivered? No. Hansen Pole Buildings is a reseller of building materials. We are not contractors and do not include any construction costs or labor for construction of your kit. What is the most important thing about taking delivery of my building? YOU MUST INVENTORY YOUR BUILDING MATERIALS WHEN THEY ARRIVE! You have 48 hours and 48 hours only to report “hidden damage”, missing or damaged goods arriving in sealed containers. Sadly, job sites suffer a high incidence of theft, especially when they are left unattended. Also, the probability of “incidental damage” increases over time. Hansen Pole Buildings, LLC, along with our suppliers, are not responsible for damage or shortages reported days, weeks, or months after the 48 hour guaranteed replacement time.
How do I inventory the steel roofing and siding when it comes in big bundles? The steel roofing and siding for your building will be in one or more large bundles (or skids). Whenever possible, the bundle should remain crated until it is located in its place of storage. Then, in the presence of the driver, break the bands - at a minimum - and lift up the cover sheet to inspect for any damage. If no damage is present, re-bundle. We also recommend you have the steel truck driver go through the steel trims with you to identify the pieces. When you sign the driver’s paperwork, please sign “not inspected for quantity or damage”. (If you notice any obvious damage in the presence of the driver, please note such on the paperwork.) In this manner, the driver is not held up and you can do a complete and precise inventory after his departure. You have 48 hours to report any hidden damage or shorted items to Hansen Pole Buildings Production Department at: 866-695-2131 Will there be more than one building on the truck? Rarely will you receive your entire building at one time, but the answer is, yes. In the case of the steel roofing and siding, there could easily be 30 or 40 buildings worth of steel on the truck. What if the delivery truck arrives and the weather is bad? Unfortunately, bad weather happens. Although this may prove to be an inconvenience, delivery trucks need to keep their schedules in order for you to get your materials in a timely fashion. What kind of equipment will I need? Usually none, but in the event it is required, generally a forklift or a boom truck with a spreader bar is sufficient. What if I am not quite ready to put the building up when it arrives? It can be stored. However, you have things to do first! Most importantly, inventory all the building materials when they arrive, promptly reporting any damaged or missing components. Store all lumber off the ground and laying flat. It is always a good idea to cover the lumber with a tarp. The trusses should be stood upright. Our construction manual gives detailed, specific instructions as to the best storage methods for many of the products in your building.
This is especially important in the case of your steel roofing and siding and overhead door(s). If you do not need them immediately it is always safest to avoid potential damage by scheduling accordingly. Again, delivery is based on each individual vendor’s production and delivery schedule. In some cases, your request for a delay in delivery of some or all components may result in additional charges to you. After your order has been placed, should any vendor increase pricing and dictate a specific time frame for delivery, you MUST either accept delivery within the time frame, or absorb the additional cost.
|
|||||
|
||||||